Archivos de la categoría ‘ALMOZARA’

4 new temporary public spaces in 3 districts of Zaragoza

13/01/2014

Due to the crisis many  vacant lands are waiting to be developped up to the master plan. In this meanwhile, 4  new temporary interventions of public space have been built during 2013 in 3 districts of Zaragoza:

1- Almozara, Etopia – Ciem buildings;

2- Rabal, Zaragoza Activa – Azucarera buildings;

3- Santa Isabel, beside an existing empty silo wich could be the new center of this ditrict;

4-Delicias intervention began in 2010 have been completed.

estonoesunsolar Etopia 2013 gravalosdimonte arquitectos 5

estonoesunsolar Etopia 2013 gravalosdimonte arquitectos web

estonoesunsolar Etopia 2013 gravalosdimonte arquitectos 6

estonoesunsolar  Rabal 2013 gravalosdimonte arquitectos

Sociedad Municipal Zaragoza Vivienda.

estonoesunsolar #32 at @etopia_ work in progress

17/10/2013

estonoesunsolar work in progress at etopiaEn vista de la celebración del V Congreso Iberoamerico de Cultura que se celebrará en noviembre, ha arrancado la obra del solar @etopia_ y @ciemzaragoza, en colaboración con el servicio de Parques y Jardines del Ayto. de Zaragoza. Keep posted.

solar ALMOZARA_ finalizado

21/12/2010

el solar de los antiguos viveros de la Almozara está finalizado. Este solar que anteriormente acogía los viveros municipales, ha sido transformado en un parque con área infantil. Su superficie es de 5.723 m² y el coste por m² ha sido de 13 euros.


Seguir

Recibe cada nueva publicación en tu buzón de correo electrónico.

Únete a otros 3.695 seguidores